The rebuild in pictures

IMG_5220 RL.jpg

1

2 dec.JPG

3

P1050664.JPG

2

1, 2: November 2011 The wooden building comes down.  3: The original concrete flooring is removed. 4: The new foundations are dug and (5) new flooring installed. 6-8: May 2022: The walls are well on their way up and the roof and insulation being put in place. 9: Doors and windows are in.  10: Solar panels being put in, and the car park surfaced. 11: Air-source heat pumps at the back near the games court. 12: September 2022: Ready to go! Front door with corridor through to back door. 

Thank you to Neil Grady for photos from his drone!

foundations2 NG s.jpg

4

_floor1 feb22_s.jpg

5

cross_gable end NG mar 22_s.jpg

8

side_heat+pumps_s.jpg

11

crane_beam1.jpg

6

insulation_1.jpg

7

main_door_s.jpg

9

side_stac s.jpg

10

front_door_corridor_s.jpg

12